Any tips when quoting for CU upgrades | Page 2 | on ElectriciansForums

Discuss Any tips when quoting for CU upgrades in the Domestic Electrician Forum area at ElectriciansForums.net

Joined
Mar 29, 2022
Messages
24
Reaction score
2
Location
Newcastle-under-Lyme
Quoting for a CU upgrade soon and it's the first time I've actually quoted one myself.

Any tips on how best to approach it? I get the principle of materials + time, but is there another stuff to watch out for that might not be obvious. Things that may have tripped (no pun intended) people up in the past that I might also miss.

Also I'll be testing before doing the upgrade so global IR L+N to E, Ze & Zs, confirming end to ends & R2 tests, borrowed neutral etc. Clearly can't realistically doing this on first visit for quote. I appreciate all jobs are different but do you do any bacic Zs etc. at the quoting stage? Or pre-empt the customer that the first part of the job is testing the installation's suitability for a new RCBO/SPD board, and that might affect the end price.

All help appreciated - thanks!
 
Last edited:
Yeah from what I've read, I believe it's most likely 30A Line and either a fused or bridged neutral. Either way DNO needs to come out and that's what I've advised initially. There's no way I'm touching them.

I've asked for an isolator too.

What's the most likely course of action from the DNO do you think? Replace the whole lot with iso and PME or do I need to get involved to specifically request that?

Obviously 30A is no good for the EV installation either so the customer really needs this sorting.
It seems if it is a fused neutral on main cut out they have a directive from hse to replace it within 21 days .whether that means a new 100 amp pme supply I'm not sure .they will soon tell you
 
Quoting for a CU upgrade soon and it's the first time I've actually quoted one myself.

Any tips on how best to approach it? I get the principle of materials + time, but is there another stuff to watch out for that might not be obvious. Things that may have tripped (no pun intended) people up in the past that I might also miss.

Also I'll be testing before doing the upgrade so global IR L+N to E, Ze & Zs, confirming end to ends & R2 tests, borrowed neutral etc. Clearly can't realistically doing this on first visit for quote. I appreciate all jobs are different but do you do any bacic Zs etc. at the quoting stage? Or pre-empt the customer that the first part of the job is testing the installation's suitability for a new RCBO/SPD board, and that might affect the end price.

All help appreciated - thanks!
Also leave a note or get the customer to request the metre guy to actually fit an isolator ,most of the time there flying thru there day and moan cos it holds them up for 10 mins..last guy I asked moaned like hell saying there not obliged to fit one .don't know if customer got charged or not
 
Totally agree. Nothing is ever as simple as it seems!
I've actually just been to look at this job and this is the main cut out situation.

Customer wants an EV charger after the CU upgrade too.

View attachment 119336
From my revision that’s an example of a fused neutral cast iron (« coffin ») DNO cutout.
Which should be reported to the DNO for replacement, from what I understand the DNO will do this on an urgent basis.
One should also get an isolator switch installed at the same time by the DNO.
 
Also leave a note or get the customer to request the metre guy to actually fit an isolator ,most of the time there flying thru there day and moan cos it holds them up for 10 mins..last guy I asked moaned like hell saying there not obliged to fit one .don't know if customer got charged or not
Last DNO interaction I had was a relocation. They just banged in a new 80A 1361 head in and said the rest was up to me or the energy supplier, no obligation to fit an iso. The work was subbed though rather than being the DNO themselves, client said when they previously spoke with the DNO directly they said they would fit an iso.
The subbies did accidentally leave some nice DNO meter seals though, which was awfully careless of them.

Personally I have a tiered fixed price for a CU swap based on # of ways. This typically works for me, if I am fitting an iso the cost of that goes on top. I will always talk it all through with the customer first, and definitely visit the property rather than going off photos alone. I also explain my price includes some pre-lim testing, the results of which may impact the job, and result in additional works to actually facilitate the CU change, typically I try and lay this out for them using a borrowed neutral as an example. I include this in the terms at the bottom of my quote too.
 
Last edited:
Well if you are going to be pedantic about it, I think you mean "earlier in this thread" even if you did mean thread and referenced post, you forgot the preposition. 🤣
Yes I did mean that and was being pedantic.i once dared to tell my journeyman he was being pedantic because I threw away the cardboard lid from a box of screws .didn't go down well ,he made me look for it the rest of the afternoon even though I new it was crumbled up in the bin .😭
 

Reply to Any tips when quoting for CU upgrades in the Domestic Electrician Forum area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Hi everyone, If you are looking for reliable EV chargers, check out our top-rated selection at E2GO! ⚡ Please note that all EV Chargers and...
Replies
0
Views
106
  • Article
As the holiday season approaches, PCBWay is thrilled to announce their Christmas & New Year Promotions! Whether you’re an engineer or an...
Replies
0
Views
895
  • Article
Bloody Hell! Wishing you a speedy recovery and hope (if) anyone else involved is ok. Ivan
    • Friendly
    • Like
Replies
13
Views
1K

Similar threads

Hi My first post here, so apologies for any mistakes. I think it will be DIY job with electrician sign off if required, but would like to do as...
Replies
0
Views
315
I generally thought double stack boards were more for situations where a portrait design is better suited to the cupboard - you still generally...
Replies
4
Views
492

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top