Hi All
I’m new to the group and not actually an electrician. But please don’t hold that against me!
I’m after some advice please. I’ve come to a point in my building renovation where we are about to install a heat pump. Stiebel Elton WPL 25AS the forms for the pump had been filled in and sent to the DNO Western Power Distribution. But they have come back to say I can’t install due to the “harmonics” that this will cause on the feed in our street.
If I want to use it we need to reinforce the power supply to our house at a cost of ÂŁ18,000!!! Payable by me.
Has anyone come across this before? Is there anyway to make the unit compatible such as a capacitor / resistor set up or Tesla battery before the unit?
Time is short as I’m at the project and don’t have time to enter into Westerns 6-8 week appeals process. At the moment I may have to go back to oil heating.
Any help or suggestion gratefully received. Thanks
I’m new to the group and not actually an electrician. But please don’t hold that against me!
I’m after some advice please. I’ve come to a point in my building renovation where we are about to install a heat pump. Stiebel Elton WPL 25AS the forms for the pump had been filled in and sent to the DNO Western Power Distribution. But they have come back to say I can’t install due to the “harmonics” that this will cause on the feed in our street.
If I want to use it we need to reinforce the power supply to our house at a cost of ÂŁ18,000!!! Payable by me.
Has anyone come across this before? Is there anyway to make the unit compatible such as a capacitor / resistor set up or Tesla battery before the unit?
Time is short as I’m at the project and don’t have time to enter into Westerns 6-8 week appeals process. At the moment I may have to go back to oil heating.
Any help or suggestion gratefully received. Thanks