bathroom down lights - notifiable? | on ElectriciansForums

Discuss bathroom down lights - notifiable? in the UK Electrical Forum area at ElectriciansForums.net

Joined
Jul 13, 2020
Messages
18
Reaction score
3
Location
malvern
good afternoon.

ive got a chap coming to change my db and i also want to change my bathroom lights to downlights.

these look like i can just drill a hole and put them in. i don't have to add a cover in the loft like the below as well do i?


i'm happy for the sparky to do the lights as well if the light job is also notifiable but if the job isn't then i can do it myself.

the bathroom has a 2.45m high ceiling. i know work in a bathroom is notifiable, but i've seen people online argue that if it's outside the zones (specifically lights higher than 225) it's not notifiable. even if it's in a bathroom.

is this right? this image confuses me as it appears that above a shower for 60cm is zone 2. so that would take zone 2 to 285 meaning that if i wanted a downlight above my shower i would have to get the sparky to do it so he can notify?

would anyone be able to clear this up for me? thank you for reading
 

Attachments

  • [ElectriciansForums.net] bathroom down lights - notifiable?
    4CC5A556-29CD-4420-B207-AA0B163456F9.jpeg
    49.2 KB · Views: 95
Always a debatable point.
The 2.25m is the height of zone, and anything inside that zone has to be suitable for it (ie IP44 etc). So the lights at 2.45m do not need to be IP rated, but good practice to do so if directly above a source of steam eg shower!
Work outside a zone but within a bathroom IS notifiable.
As the lighting cable is serving the location (bathroom) and the lights are accessed from the bathroom my opinion is that it IS notifiable!
 
@DefyG not correct. Any work inside a special location is notifiable.
but all of a bathroom is NOT a special location.
here is the exact definition- from the IET information site:


A special location means:
  • A room containing a bath or shower, the space surrounding a bath tap or showerhead where the space extends vertically from the finished floor level to a height of 2.25 metres or the position of the showerhead where it is attached to a wall or ceiling at a height higher than 2.25 metres from that level or horizontally where there is a bathtub or shower tray, from the edge of the bath tub or shower tray to a distance of 0.6 metres. Or where there is no bath tub or shower tray from the centre point of the shower head where it is attached to the wall or ceiling to a distance of 1.2 metres.

  • so, anything above 2.25metres is not considered a “Special Location”. So not notifiable work. You have made the mistake of stopping reading at the first comma in the description. You have to read all of it!
 
I haven't got the BBB at home to check but by that definition a 13A socket could be under 3m, outside a zone and not be in a special location?
I thought special location referred to a 'room' containing a bath or shower?

Apologies if I'm wrong ...... everyone has their own opinions which do not always help the OP.
 
Posts 2, 4, 6, & 8 are correct but I'd say leave it to the sparky.
Is the lighting circuit RCD protected?
If so does it trip within the specified times?
Do you have equipment to measure the Zs as I notice they are a class 1 fitting, does the lighting circuit even have a cpc?
Is the supplementary bonding in the bathroom up to scratch?
You will also need to complete a minor works certificate - showing readings as above.
 
Last edited:
Thanks everyone. I have a megger tester to do zs and rcd times.

the lights aren’t rcd protected at the moment but will be after I get a registered guy to replace the dB.

so I’ll physically fit the lights now but connect them up after the chaps changed the board.

thanks again
 
Thanks everyone. I have a megger tester to do zs and rcd times.

the lights aren’t rcd protected at the moment but will be after I get a registered guy to replace the dB.

so I’ll physically fit the lights now but connect them up after the chaps changed the board.

thanks again
Why wait? Connect them up if you are competent. Your electricians job is to change the board.... he’ll do some testing beforehand and afterwards.
If the downlights are IP rated, as most of them are, there shouldn’t be a problem.
 
Instead of trying to wriggle out of getting the electrician to do the work by trying to find the exact extent of the rules why not just get the electrician to do the work?

Then you can be safe in the knowledge that the work has been carried out by a qualified professional and have the cerfificate to prove it.
 

Reply to bathroom down lights - notifiable? in the UK Electrical Forum area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
299
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
807
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
848

Similar threads

  • Question
ok cheers for the help lads
Replies
7
Views
704
  • Poll
Hi Folks, I'm looking for downlights that satisfy the following criteria: (1) white bezel; (2) fire-rated; (3) IP65 or above; (4) anti-glare...
Replies
0
Views
536

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top