Hi,
Been doing a full rewire on a social housing 2 bedroom house.
Lifted the floorboards to find that the house has been rewired in the past.
The sockets were really low maybe 75mm off the floor, also the original cables to the sockets had be cut with about 3 foot left connected to the old rewire via terminal connectors wrapped in tape & far to much outer sheath stripped back.
Not a quality job done lol.
Now new cables are in, sockets & switches at the usual 450mm / 1200mm heights.
New crabtree CU, 2 afdd & rcbo's, revive 7 fans in kitchen & bathroom, 2nd fixing still to do.
Give it 6 - 12 months & tenant will probably have trashed the place lol
Been doing a full rewire on a social housing 2 bedroom house.
Lifted the floorboards to find that the house has been rewired in the past.
The sockets were really low maybe 75mm off the floor, also the original cables to the sockets had be cut with about 3 foot left connected to the old rewire via terminal connectors wrapped in tape & far to much outer sheath stripped back.
Not a quality job done lol.
Now new cables are in, sockets & switches at the usual 450mm / 1200mm heights.
New crabtree CU, 2 afdd & rcbo's, revive 7 fans in kitchen & bathroom, 2nd fixing still to do.
Give it 6 - 12 months & tenant will probably have trashed the place lol