Guest viewing limit reached
  • You have reached the maximum number of guest views allowed
  • Please register below to remove this limitation

Marti

-
Arms
I know I'm going to regret askin' but I never learn so here are two contentious question in one.
The best CCU, and by "best" I mean plenty of installation room, good quality screw fixings and reliable RCDs / RCBOs. Personally, I still like Schneider; maybe because that's what I trained on. The high price has minimal impact on the final invoice but maybe I'm fooling myself?

Separately, Has anyone tried Chintz from Screwfix? Saw them at the electrician's Show (not difficult to find, no bloody stands this year) and they appeared to be good quality but I know only fitting a few will tell and that's customer service risk. I did run a search in here as I assumed this question had been done to death but no luck.

Now, who's got my tin 'at!
 
Only time I saw a chint install I was testing it for an EICR and lost every one of the RCBOs blew up when I tested them. I had to go back and replace at least 80% of all the RCBOs that were in the board.
I'd never use Chint.
what did you test them with.... a hammer???
 
Only time I saw a chint install I was testing it for an EICR and lost every one of the RCBOs blew up when I tested them. I had to go back and replace at least 80% of all the RCBOs that were in the board.
I'd never use Chint.

What tests were you doing when this happened?
 
We've used Chint for 6 months now. We have fitted over 100 boards, we have never had one single failure of any component.
We got stuck last week and fitted an MK board. Absolutely horrible after using chint. Prices are exactly the same too.
Our inspector recommended solid links on a TT system (without a main time delay RCD) therefore Chint was the only make I could get at the time with the solid links, These solid links IMO are WAY higher quality that any board sporting the shitty flexible (messy) links.
 
We've used Chint for 6 months now. We have fitted over 100 boards, we have never had one single failure of any component.
We got stuck last week and fitted an MK board. Absolutely horrible after using chint. Prices are exactly the same too.
Our inspector recommended solid links on a TT system (without a main time delay RCD) therefore Chint was the only make I could get at the time with the solid links, These solid links IMO are WAY higher quality that any board sporting the shitty flexible (messy) links.

That’s interesting. Did your inspector qualify their recommendation for solid links rather than flexible for TT installations?
 
Best EV Chargers by Electrical2Go! The official electric vehicle charger supplier.

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Advert

YOUR Unread Posts

Daily, weekly or monthly email

Thread starter

Marti

Arms
-
Joined
Location
Poole, Dorset
If you're a qualified, trainee, or retired electrician - Which country is it that your work will be / is / was aimed at?
United Kingdom
What type of forum member are you?
Practising Electrician (Qualified - Domestic or Commercial etc)
Business Name
Jigsaw Electrical Services

Thread Information

Title
Best CCU is Schneider...Oh no it isn't. Anyone tried Chintz?
Prefix
Forum
UK Electrical Forum
Start date
Last reply date
Replies
52
Unsolved
--

Advert

Thread statistics

Created
Marti,
Last reply from
Wilko,
Replies
52
Views
10,050

Advert

Back
Top