Best Dual Inverter combo for 7.5kW? | Page 2 | on ElectriciansForums

Discuss Best Dual Inverter combo for 7.5kW? in the Solar PV Forum | Solar Panels Forum area at ElectriciansForums.net

Do you specifically have to have a G59 type verified inverter for any system over 16A? Or is it more that you need to have pre applied to the DNO with the correct G59 forms completed.
 
I did an Application for Connection for a generator > 16A per phase and the conversation I had with two engineers were they had to be G59 certified as the 'relaxed rules' were no-longer in operation. My conclusion is that now, if you go over 16A, you need to pre-apply (as always) and it has to be G59.

So, as before, where I put a single SB4000TL in, I did a G83 pre-application, I now do a G59 pre-application. Hope that makes sense.
 
I spoke with one of our engineers to clarify this issue for myself after contributing to this thread, and thought my investigations may help others. (better late than never!)
Anything over 16A is now G59 as PVNewbie correctly stated. If the inverter is not G59 certified it does not necessarily rule it out as being possible to use for an install over 16A. The G59 certificate simplifies the connection process of the generator to the grid. If the inverter is not G59 certified, you will need to comply with the regs as described in section 6.1.4 and 12.2.5 of the ENA Engineering recommendations G59/2-1

As a reply to the original post - We distribute for SolarMax, and both their 4200S and 6000S are both G83 and G59 certified (together with all of the 3 phase "MT" range being G59 certified, but they would not be suitable in this case)
 
SMA 7000TL they are G59 i think, Steve at Wind and Sun has some in I think that he got for a job for me last year, I'm sure he'll be looking to get rid ;-)

Its a little on the low side at max DC 7200w but not far off
 
@PVNewbie, As I undertsand it the problem is limiting your output to the max allowed by the DNO, but not comprosing on production...

1) Try the EMMA EC - double win, 1) use as much energy as possible that uou generate, and 2) can limit the export. so you'd get a float top to your export without limiting power / energy production. used to be called EMMA GVS, Emma GVS | Worcester Renewables now called EMMA EC (need to update our page :) EC can be added as an option to any EMMA

2) SMA also have an export control device that powers down parts of the array to meet the DNO's limits, though not yet seen one of those installed in the UK POWER REDUCER BOX


Both the above are common practice in other countries, as usual , UK is a bit skow to catch on .....
 
For a 7.5kWp system, single-phase, you could choose an Eltek 7200TL - single-phase, G59/2 approved, 8.1kWp max PV, 3 string inputs (MC4, 1 MPPT), embedded data-logger (30yrs), IP66, 98% peak eff., transformerless, built-in DC switch (Santon), 10yrs warranty.
 

Reply to Best Dual Inverter combo for 7.5kW? in the Solar PV Forum | Solar Panels Forum area at ElectriciansForums.net

Recommended Sponsor News

  • Article
thanks for the clarification. ( also thanks to Dan. ).
Replies
6
Views
2K
  • Article
More info on link below http://sbsc.uk.net/
    • Like
2
Replies
22
Views
9K
  • Article
Happy Friday Everyone! Subscribe for more jokes direct to your mailbox or send us your own jokes to be in with a chance of featuring, by clicking...
    • Like
2
Replies
27
Views
6K

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top