I have a situation where we have altered nearly 100 new circuits purely by adding a cable from the supplied isolator to a 3p+n plug to supply pumps. Each isolator is on its own circuit from the local DB and we need to issue certs for all these alterations, I was curious if there was a recommended faster way to cert all the alterations as 100 minors works certs seems a bit excessive.