Ok thanks so I Install sub board near the meter and then run 16mm cable from the sub board to the main consumer unit in the barber shop
Normally you'd install either a fuse-switch or a switchfuse at the incoming supply position rather than a DB, this gives you some hope of achieving selectivity.