Hello guys
I have a car charger installation coming up and will be installed as per the below.
TN-S supply to building
35mm thermosetting main tails supply existing 3 phase DB.
X 5 chargers to be supplied by by 4mm SWA cabling on tray protected by a 32a 30ma RCCBO. the chargers are located outside the building.
1st question is because we have a TN-S supply i dont need to make special arrangements like you would under a PME system?
2nd question what special considerations may i have missed?
I have a car charger installation coming up and will be installed as per the below.
TN-S supply to building
35mm thermosetting main tails supply existing 3 phase DB.
X 5 chargers to be supplied by by 4mm SWA cabling on tray protected by a 32a 30ma RCCBO. the chargers are located outside the building.
1st question is because we have a TN-S supply i dont need to make special arrangements like you would under a PME system?
2nd question what special considerations may i have missed?