Completed an EICR last week on a flat that is roughly 20 years old, wired to the 16th.
It had been tested last in 2007 and had been given a code 1 for no supplementary bonding in the bathroom.
Slightly harsh to say the least but after investigation I found that all the pipes were plastic.
Also a code 2 was given for the SWA sub-main cable not clipped above the board (400mm in length).
But the termination was not even noted. See picture.
Overall a unsatisfactory was given yet I could for the life of me see why.
Ps I gave it a unsatisfactory cos some one had change a mirror light to a shaver socket and not connected the earth. (C2)
It had been tested last in 2007 and had been given a code 1 for no supplementary bonding in the bathroom.
Slightly harsh to say the least but after investigation I found that all the pipes were plastic.
Also a code 2 was given for the SWA sub-main cable not clipped above the board (400mm in length).
But the termination was not even noted. See picture.
Overall a unsatisfactory was given yet I could for the life of me see why.
Ps I gave it a unsatisfactory cos some one had change a mirror light to a shaver socket and not connected the earth. (C2)