Continuity at socket on ring main | Page 4 | on ElectriciansForums

Discuss Continuity at socket on ring main in the UK Electrical Forum area at ElectriciansForums.net

ryan77

-
Joined
Jan 4, 2013
Messages
18
Reaction score
1
Location
wawwick
Replacing cracked cover on ring circuit, the mcb was turned off , circuit dead
tested with volt meter and got beep continuity on L-N L-E N-E, .
Ring working before replaced the socket front .

Im thinking because appliances with neons pugged in on the ring
and it being TNC system that this accountts for it, but wondering if this right ?
All commets welcome.
 
The M60 is great.
Confuses all the scousers to getting into Manc, they just go round and round and round in circles.

like lancasters over berlin. just working out the best place to drop the load.
 
My 10 year old is a Horrible Histories addict (it is a good programme), the Hun used to use a tourist guide book to find places to bomb.
How the hell did Liverpool get any bomb damage?


inner city regeneration. what the council could not demolish, the luftwaffe did.
 
Cheers H, they say on HH, "They bombed Lűbeck first"

It amazes me on my travels around Europe, all the architecture that you'd think has been there for centuries, a vast majority of it was bombed in WW2 to piles of rubble.
The rebuilding they've done is outstanding!
 
on humberside they had an elaborate setup of lights in some fields west of where the humber bridge is now....all designed to mimic the layout of the docks....

so german aircraft having sighted the entrance to the humber estuary...would then use the humber as a guide...and drop their payload on what they thought was the st Andrews docks...

except it wasn`t...just some fields....lol...
 
Cheers H, they say on HH, "They bombed Lűbeck first"

It amazes me on my travels around Europe, all the architecture that you'd think has been there for centuries, a vast majority of it was bombed in WW2 to piles of rubble.
The rebuilding they've done is outstanding!
like the dresden & cologne raids...

where about a third of the city simply disappeared overnight...

in fact the i think it was the archetect albert speer who personally went to visit the aftermath....

and reported back to Adolf Hitler that another 4 raids like that and germany would be finished...

it was the first 1000 bomber raid....

and the ordnance rained down all night....
 
like the dresden & cologne raids...

where about a third of the city simply disappeared overnight...

in fact the i think it was the archetect albert speer who personally went to visit the aftermath....

and reported back to Adolf Hitler that another 4 raids like that and germany would be finished...

it was the first 1000 bomber raid....

and the ordnance rained down all night....

Are you referring to 'Bomber Harris' there?
He was a totally lunatic by all accounts!
 
You've been watching Yesterday Glenn!
Don't forget the blow up aeroplanes, tanks etc...
Damned clever those Brit chaps! :)
The genius was the code breakers.
there was a factory at Yeadon..

the Lancaster was built there...

i think there was a place at audenshaw as well...

anyway, this factory...which had been constructed as a `sleeper factory`..in the years immediately prior to WW2 was constructed underground....on the roof there were fake cows and sheep in `fields`....

the Luftwaffe never suspected....

i think some of it is still there...AE turbines were using it ....
 
Last edited by a moderator:

Reply to Continuity at socket on ring main in the UK Electrical Forum area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
715
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
1K
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
3K

Similar threads

Continuity of the suspect cable appears fine all cores, from this I could work out the length of it and it really doesn’t appear looking at the...
Replies
2
Views
386
  • Question
They ought to be able to check for the voltage going completely off using one MCB off at a time to confirm that. That would be my assumption...
Replies
9
Views
904

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top