D.I.Y. REWIRE-- A Step By Step Guide. | Page 5 | on ElectriciansForums

Discuss D.I.Y. REWIRE-- A Step By Step Guide. in the Australia area at ElectriciansForums.net

telectrix

-
Mentor
Nearly Esteemed
Arms
Joined
Sep 5, 2010
Messages
73,534
Reaction score
71,831
Location
cheshire/staffordshire
1. Remove all heavy furniture from upstairs. Place in Storage.

2. Roll up all upstairs carpets. Ditto.

3. Lift floorboards to enable cable routing (not the ones that the plumber has wrecked, fitting central heating)

4. Move all downstairs furniture to centre of rooms and cover with dust sheets.

5. Cover all ground floor carpets with polythene sheeting.

6. Chase out from ground floor ceiling vertically to every point you require a fitting/accessory.

7. Now that you've realised that you are totally out of your depth, get on the phone to a qualified Sparks.
 
Rsmck: do you know why we clip cables and why we clip them at 250mm centres? Its just that you mentioned in your post near the top of this page that you have left some unclipped above a bathroom? Did you know that a fault current reaches full potential on the first quarter cycle which places serious strain on unclipped cables? Thats why we clip em...........
 
Des 56, are the individual instruments really better than multifunction testers? If they gave different readings, the MFs wouldn't get their calibration certs would they?

Please dont read too seriously into that post, the occasionall light hearted and stupid comments tend to be a weakness of mine

To answer your post

"Better" ? Of course individual instruments are better
At least in my opinion they are
Different readings,now come on sir,I haven't stated that,----yet
[ElectriciansForums.net] D.I.Y. REWIRE-- A Step By Step Guide.


Each to their own I suppose,my reasons are
If for instance the meter devleoped a problem,I dont lose the functions of the other meters,whereas if a multifunction tester develops a problem, you have lost the lot

Setting the instruments up for the various functions is a pain in the backside,beep,beep,change,beep beep,change :sleeping:

When I am testing away from the dist board,there is not that cumbersome contraption to haul around, beep beep

There are downsides to seperate instruments and I will think of one in a moment


OK after musing for a few minutes,I have managed to conclude that, yes,they cost a little extra for callibration and,and,and sorry, thats it
[ElectriciansForums.net] D.I.Y. REWIRE-- A Step By Step Guide.
 
Rsmck: do you know why we clip cables and why we clip them at 250mm centres? Its just that you mentioned in your post near the top of this page that you have left some unclipped above a bathroom? Did you know that a fault current reaches full potential on the first quarter cycle which places serious strain on unclipped cables? Thats why we clip em...........

It's funny that you mention clipping, because in another thread regarding running cables down the inside of stud walls, it was intimated that the normal course of action is to not clip (well at least not as often as required) because to do so would mean knocking too many holes in the wall??

It always amazes me however, when people have chosen not to clip, not because clipping would be an inordinate amount of work but simply because they could not be bothered. Suspended ceilings seem to be a case in point, as I've come across quite a few where the cable for lighting is simply laid on top :nono:
 
Rsmck. I see you are online. I have to apologize to you and admit that I thought you were the OP to this post. I picked upon the post when your name was next to the subject matter , this is what led me to believe that this was your post.
I can see that you are a person of integrity and that you knowledge is well above that of the average layman and would not have contributed in the manner that I did.
 
Rsmck. I see you are online. I have to apologize to you and admit that I thought you were the OP to this post. I picked upon the post when your name was next to the subject matter , this is what led me to believe that this was your post.
I can see that you are a person of integrity and that you knowledge is well above that of the average layman and would not have contributed in the manner that I did.

Well said.....
 
Anyone mind if I change the subject back to cable clips?

No, good :)

How long have the regs for clipping cables been around? I only ask because NONE of the cables in my place are clipped at all.
 
GLENNSPARK,

The unclipped cables will be clipped as soon as the bathroom is redone (soon!) at present they are in a ceiling void, between low powered downlights and protected by an RCD.

As far as I'm aware there is no specific regulation to stipulate how often cables are clipped other than they should be supported along their length and to prevent stress to the cable and terminations.

There was a table in the 16th Edition of minimum separation distances, but as far as I can see this is no longer in the 17th.

The regs require where cables are not supported continuously due to the method of installations they shall be supported by suitable means at appropriate intervals in such a manner that the cables do not suffer damage by their own weight (522.8.4)

Considering the (temporarily) unclipped span of 1.5mm cable is around 1.2m at it's longest and there is no risk of movement to the cables and no appreciable stress on the terminations or the cable from its own weight over such a short distance I consider it to be safe.
 
Last edited by a moderator:
Whats a cable clip?:smile5:

Well in the installation I removed it ranged from a small length of rubber cable cut and stapled across the cable to hold it in place to a large nail put straight through the centre of them(!)

Generally I'd use the little plastic ones, much easier and less likely to fry whoever lifts the floorboards and finds the nail ;)

[I almost feel I have to add a disclaimer that this is intentionally written with a tone of sarcasm/poor attempt at humour as opposed to suggesting for a minute I was nailing through the cables - but it is genuinely what I found in this place!]
 
Last edited by a moderator:
Well in the installation I removed it ranged from a small length of rubber cable cut and stapled across the cable to hold it in place to a large nail put straight through the centre of them(!)

Generally I'd use the little plastic ones, much easier and less likely to fry whoever lifts the floorboards and finds the nail ;)

[I almost feel I have to add a disclaimer that this is intentionally written with a tone of sarcasm/poor attempt at humour as opposed to suggesting for a minute I was nailing through the cables - but it is genuinely what I found in this place!]
Ah , I believe I've seen the odd one or two now you come to mention it.
Edit to add -you have a real treat to look forward to when you pull your first kitchen out,:yes::yes:
 
Last edited:

Reply to D.I.Y. REWIRE-- A Step By Step Guide. in the Australia area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
As the holiday season approaches, PCBWay is thrilled to announce their Christmas & New Year Promotions! Whether you’re an engineer or an...
Replies
0
Views
450
  • Article
Bloody Hell! Wishing you a speedy recovery and hope (if) anyone else involved is ok. Ivan
    • Friendly
    • Like
Replies
13
Views
946
  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
895

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top