Afternoon all,
I have gone to look at installing an extra Socket on a radial circuit in a local cafe and the new DB which was installed by the another Electrician does not have one single label on any of the circuit breakers. The installation only took place in April and I cannot see any details of the installation and the manager also does not have them either.
My question is if I was doing a Domestic installation I am expected to label and supply details of every circuit. Is this not the same practice for a DB in a commercial environment?
It took me half an hour to positively identify the circuit for safe isolation.
Many thanks
Andy
I have gone to look at installing an extra Socket on a radial circuit in a local cafe and the new DB which was installed by the another Electrician does not have one single label on any of the circuit breakers. The installation only took place in April and I cannot see any details of the installation and the manager also does not have them either.
My question is if I was doing a Domestic installation I am expected to label and supply details of every circuit. Is this not the same practice for a DB in a commercial environment?
It took me half an hour to positively identify the circuit for safe isolation.
Many thanks
Andy