Hello Guys

I am a commercial electrician and before we change old consumer units we always carry out an EICR as the clients have money on the commercial side of things, domestics however not so much.

on the domestic front i looked a shoddy HMO for a landlord today and they dont want to pay for a report before we change the DB.

I understand the obvious quick bond an insulation resistance checks you can carry out but your going to have to give an install cert after and you may find all kinds of crap, for example o had 0.15Mohms LN-E which could be anything.

basically without knowing what your hooking the new DB up to how do you advise the client on costs when the fixed wiring also needs to be signed off and on face value looks crap?
 
Hello Guys

I am a commercial electrician and before we change old consumer units we always carry out an EICR as the clients have money on the commercial side of things, domestics however not so much.

on the domestic front i looked a shoddy HMO for a landlord today and they dont want to pay for a report before we change the DB.

I understand the obvious quick bond an insulation resistance checks you can carry out but your going to have to give an install cert after and you may find all kinds of crap, for example o had 0.15Mohms LN-E which could be anything.

basically without knowing what your hooking the new DB up to how do you advise the client on costs when the fixed wiring also needs to be signed off and on face value looks crap?
If the Landlord wont pay for repairs, it's your neck on the line.
 
ALL my estimates for replacing fuseboards include this:

"NB: If problems are detected during the fuseboard change additional work may be required. Such issues and associated costs will be discussed with you, prior to being implemented"

If its looking carp I won't even entertain providing a price for the change unless a basic EICR is done first.

As Pete says - maybe its best to walk away..................
 
Perhaps a line like;
In the event of a circuit not complying with BS7671 or presenting possible danger we may elect not to connect that circuit and/or issue a danger notice in our sole discretion as the installing engineer. This will be immediately communicated to the person ordering the work.
We will ensure the reasons for such an action are made clear, and the remedies and costs made known to obviate this course of action.

I don't know something along those lines anyway.
 
I agree with what's been said. Either walkaway or have a price that contains sufficient clauses to cover you and then repeat them all in writing email/letter to the landlord so he understands. He wont read the estimate, he will just look at the bottom line.

Personally I'd walk away though (after telling him he's a d1ck :) ).
 
Perhaps a line like;
In the event of a circuit not complying with BS7671 or presenting possible danger we may elect not to connect that circuit and/or issue a danger notice in our sole discretion as the installing engineer. This will be immediately communicated to the person ordering the work.
We will ensure the reasons for such an action are made clear, and the remedies and costs made known to obviate this course of action.

I don't know something along those lines anyway.
I totaly agree but the ever so slight problem after finding a issue is, the Landlord may say, "well" I'm not paying you.
 

Reply to Domestic Fuse board change politics in the Domestic Electrician Forum area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
397
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
986
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
1K

Similar threads

  • Question
Nothing wrong with it. Which manufacturers have you got this information from? What do you mean by trip speed? Fuses and MCBs can operate in the...
Replies
11
Views
2K
davesparks
D

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top