So I'm currently testing a system and was wondering what earthing documentations is needed/sufficient. The company I'm working for doesn't have any records so thought here would be the best place for advice.
Using a low resistance ohm meter do I need to record measurements from the main incoming earth supply to each removable pannel, din rail, transformers etc and record the readings? Or is it sufficient enough to have a tick box to say all panels and components within the system have been tested and all results are 0.2 or lower?
Also is a flash test mandatory?
Thanks for any advice or help anyone can provide.
Using a low resistance ohm meter do I need to record measurements from the main incoming earth supply to each removable pannel, din rail, transformers etc and record the readings? Or is it sufficient enough to have a tick box to say all panels and components within the system have been tested and all results are 0.2 or lower?