Hi there,
I am looking for an electrician to do works on a small unit (700sqft) that I intend on turning in to a small restaurant.
I am at a crossroads currently regarding the power supply and I am looking to either bring in a new 3 Phase supply (ÂŁ3900) or run a convertor until the building's main supply has been upgraded which will give us the option of upgrading our supply from that (ÂŁ2500).
My main problem currently is I need to install a duct underneath the shop fascia for Electricity North West to feed the power supply through. It requires excavation approx 500mm deep and then outwards underneath the outside wall. There is a basement underneath used by another business and we are on a suspended timber floor above them. Will going that deep have an impact? This is a very large building in Manchester City Centre.
Our kitchen will consist of:
Extraction system that exhausts above the entrance door.
4 hob electric range/oven combi
2 large stockpot electric hobs
Twin tank electric freestanding fryer
Refrigeration
Lighting throughout
Hand dryer
Amplifier and speakers
Plug sockets to run blenders, computer, till system.
Can you please tell me approximately how large of a supply I would need for this equipment?
As mentioned above this work is to be carried out in Manchester starting in approximately 1 month. I am looking for somebody reliable to advise me and carry out any works internally. Installing the duct for a new supply is priority for me right now.
Regards
Danny
I am looking for an electrician to do works on a small unit (700sqft) that I intend on turning in to a small restaurant.
I am at a crossroads currently regarding the power supply and I am looking to either bring in a new 3 Phase supply (ÂŁ3900) or run a convertor until the building's main supply has been upgraded which will give us the option of upgrading our supply from that (ÂŁ2500).
My main problem currently is I need to install a duct underneath the shop fascia for Electricity North West to feed the power supply through. It requires excavation approx 500mm deep and then outwards underneath the outside wall. There is a basement underneath used by another business and we are on a suspended timber floor above them. Will going that deep have an impact? This is a very large building in Manchester City Centre.
Our kitchen will consist of:
Extraction system that exhausts above the entrance door.
4 hob electric range/oven combi
2 large stockpot electric hobs
Twin tank electric freestanding fryer
Refrigeration
Lighting throughout
Hand dryer
Amplifier and speakers
Plug sockets to run blenders, computer, till system.
Can you please tell me approximately how large of a supply I would need for this equipment?
As mentioned above this work is to be carried out in Manchester starting in approximately 1 month. I am looking for somebody reliable to advise me and carry out any works internally. Installing the duct for a new supply is priority for me right now.
Regards