View the thread, titled "ELI at pendant..using long lead" which is posted in Australia on Electricians Forums.

C

claire_r

Hey all, quick question for you.

Did an earth loop at a socket, got 20 ohms which is acceptable as it's on an rcd.

Did another earth loop on a soft test at a light fitting using a long lead l/n at socket and connected to earth at light. The lighting circuit not being on an rcd.

Got 20 ohms again?

Am I reading through the socket circuit by using this method? I would presume I'm testing the earth at the light back to the board and so on but I'm confused as to how I got the exact same reading? This reading not being acceptable if it's not on a rcd.

Any ideas welcome, thanks :)
 
The main reason i haven't bought them, is that i not yet got into a situation where i've thought 'i wish there was some gadget that would make this easier'.

Thats the trouble with you young'uns. Always want the easy way!
:D
 
I like coffee, I'm gettin some....:D
ffffffff

Yeah, I've made my own adaptors for "kliks" and the like, just put a single socket in the other end of the plug flex.
even better.
the kit looks good though---dunno about the 55 quid mind.
There are so many variations though,that aren't covered,such as those gu 10's that only take cfls(sgu10 i think they're called),Ges,pl etc.
One of the meters I had been using a little while back had a adapter on the earth probe that you could plug in your N probe,which gave you a spare hand to hold onto your steps.Your test is between phase and earth.
(croc clip on earth)
 
Last edited:
lol well thanks all for suggestions....hmm i might have to have a looky into the plug in adapters...make my life alot easier as yet again today.....eli at a pendant....did it the old fashioned way though....wish i had pointier elbows to press the test button hehe.
 

Reply to the thread, titled "ELI at pendant..using long lead" which is posted in Australia on Electricians Forums.

Best EV Chargers by Electrical2Go! The official electric vehicle charger supplier.

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Daily, weekly or monthly email

Back
Top