I am in the process of doing my first quote and wanted to see what people thought in regards to my price as this is my first one since becoming registered so it would be great to see if I am in and around the right lines or whether I am way off the mark.

The job is as follows:

-Fitting three double sockets to an existing ring final and chasing the cables in the wall horizontally between them (I know not best practice but the client has concrete floors and is really against surface trunking).
-The chases will be about 3 meters either side of the existing socket, il fit some conduit for a bit of extra protection but the circuit is protected by an rcd and the cables will be in the safe zones so won`t need to go too deep.
-Some AV work chasing in and fitting 2 HDMI cables, a USB, coax and a Network cable to modular face plate on a wall from behind where the client wants the tv mounted to where the sky box/router is. (about 3m in total end to end).
-Making good by bonding and skimming all the chases
-The walls are all masonary.
-Tested and minor works cert issued.

I`m looking at it as a full days work possibly a day and a half with the plastering and fiddling with the coax and network cable so was going to charge ÂŁ220 labour + Materials.

Does this sound about right or is it too under/over priced? If any of you experienced guys could offer some advice it would be greatly appreciated, feels a bit alien to me at the minute with it being new and this forum has been really helpful so far with advice.
 
Thank you, thats made me a bit happier as I was thinking it seemed like a fair bit of work for not that much money but felt like I was charging too much with me not being used to normal prices that are charged. I also don't want to undercharge because I don't want to undermine all the training and studying it takes to become qualified so thought best to check
 
Well on publications and training in the past year alone I have spent ÂŁ3k. While the customer may not realise what they are paying for they do have to pay for me to keep abreast of current matters electrically. I suppose that is why people can undercut me who don't spend on that kind of thing. But then you get what you pay for don't you. By the way I meant ÂŁ280 per day not ÂŁ320 that is for unsocial hours the higher rate.
 
Recently did AV stuff with similar specs...fortunately the plaster was 35mm deep and I could choose the route.
Installation was easy, but making good was a nightmare. A day and a half, ÂŁ400 + materials...to be fair, no mains voltage cables involved.
I did do the emulsion painting at the end.
 
No I was going of a rate of ÂŁ180 a day + the ÂŁ40 in case it ran over because of just starting out but maybe I should up that taking into account cost of courses training etc like what Vortigern mentioned. I'm glad I asked here, thanks for all the asvice.
 
I'm far from the most experienced spark in here but here's something for comparison and one I gratefully lost today.
3 x 5m house extension in outer London. Requires sockets, down lights, Outside lights and sockets. TV co-ax connection and Part P certificate. Builder is somewhat disorganised so attracts my PITA tax of 10% and I'm not VAT registered. Board has space for extra circuits.

I quoted ÂŁ1275 and lost it to a quote of ÂŁ600! Mate - you are welcome to it at that rate. FFS, I can charge that for 3 / 4 days subbing and then nothing is my problem - fit and forget.

Expecting a call in about a month - " just a few things to finish off and we'll need you to supply a certificate"
 
Last edited:

Reply to First Job estimate price check in the UK Electrical Forum area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
361
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
920
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
1K

Similar threads

  • Question
After fitting out the first room of downlights.... i expect him to get a bit speedier at fitting them There is so many unknowns to price at this...
2
Replies
25
Views
2K
  • Question
You need a CT clamp at main tails, it depends on the rules where you are - you used to be allowed wireliss ones (such as MyEnergi Harvi), these...
Replies
14
Views
3K

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top