amlu
-
will be happy to do it for £150 cash + cost of materials (fusebox, tails, bonding cable), signed off with elecsa certificate.
adding couple of quid if running bonding cable is pain in the back.
down in east london £150 a day is good money,
if someone is including fuse box in £150 they may have supply of them doing some council rewires, or they may be Romanian Cowboys (more and more of them around), and dont worry about bonding and paperworks.
adding couple of quid if running bonding cable is pain in the back.
down in east london £150 a day is good money,
if someone is including fuse box in £150 they may have supply of them doing some council rewires, or they may be Romanian Cowboys (more and more of them around), and dont worry about bonding and paperworks.