Dear All,
we are due to install a new pump station and found the property has many DB's, the one we are looking at is wired direct to DNO supply via a RCd then Henly block. (DB2)
The garage has a supply out of the property(lets say garage 1) which is linked through the sockets. i want to take a line from this supply (garage 1) and split it to take the new pump station. so i will need to install a mini CU. i believe this will be under Part P, but not so sure as this would have already been checked.
I would like to know what other would classify it as? also would i take the ZE from DB2? and if the RCD trips on high, should i take a reading via Zs
we are due to install a new pump station and found the property has many DB's, the one we are looking at is wired direct to DNO supply via a RCd then Henly block. (DB2)
The garage has a supply out of the property(lets say garage 1) which is linked through the sockets. i want to take a line from this supply (garage 1) and split it to take the new pump station. so i will need to install a mini CU. i believe this will be under Part P, but not so sure as this would have already been checked.
I would like to know what other would classify it as? also would i take the ZE from DB2? and if the RCD trips on high, should i take a reading via Zs