Thats why its best practise to have its own RCD. Regs say if buried in wall less than 50mm RCD has to be installed.
 
moggy are you suggesting i do not use an rcd at all, feels dangerous?

if it's not required under 7671 then yes.
7671 is there to ensure public safety from electrical installations, so if 7671 says it's not needed, then it isn't dangerous to omit one.
however, installing a solar installtion that affects the operation of the domestic RCD definately is!
 
GO TO BED MAN!!

you've got a big day tomorrow, you'll be fine, just make sure you connect the meter up the right way round (classic mistake for newbies!)

insomnia rules!:coffee:
 
murphy's law anything that could go wrong went wrong and we have to finish the job tomorrow an hour and halfs work left and still gotta test wish me luck
 
cant find anything on hear about testing mini invertors gonna do normal ac testsupto unplugged output of last mini invertor. any comments keep them coming i will check when i get up thanks people
 
Do a quick Voc and Ioc check on each panel before installing to the microinverters (though tbh the failure rate for most panels is in the a few in a million mark, and all you're really risking is having to get back up there to replace a panel if it does fail as you should be able to see which panel there's a problem with via the microinverter software anyway).

I'd expect you should have a seperate AC isolator for the string inverter circuit and the microinverter circuit as well btw - partly needed so you can test the microinverter circuit without blowing up the other inverter (though I suppose you could just disconnect it)
 
it should be two strings but one cable


you should be going from panels to isolator to inverter


then from inverter some t+e down to board (cant remember how exactly you do generation meter)

the guy i was with added in a 2 way cu as you need some form of isolation as well as a breaker so a cu is better imho
 

Reply to generation meter installation in the Solar PV Forum | Solar Panels Forum area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
303
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
819
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
897

Similar threads

On a 20kw generator can you connect the 30AMP plug to one service panel and the 50amp plug on a seperate service panel? I have two service panels...
Replies
0
Views
215
Hi My first post here, so apologies for any mistakes. I think it will be DIY job with electrician sign off if required, but would like to do as...
Replies
0
Views
191

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top