I have 2x inverter domestic installation and need some advice on the meter position.
In order to meter generation from both inverters, and both inverters needing a separate MCB, I need to place the meter before a 2 way CU. Would the correct approach to be take tails directly from a henley block to the generation meter, then from the meter to a dedicated 2 way dedicated CU.
What do others do on these jobs?
In order to meter generation from both inverters, and both inverters needing a separate MCB, I need to place the meter before a 2 way CU. Would the correct approach to be take tails directly from a henley block to the generation meter, then from the meter to a dedicated 2 way dedicated CU.
What do others do on these jobs?