Gents, in need of your experience/knowledge.
Im working in maintenance at a student accommodation. ( over 900 rooms, over 60 boards )
The buildings need their periodic inspection and testing.
Im trying to be as less disruptive as possible so am just turning the circuits off under test. However, im finding this really uncomfortable, what with the arching and cpcs squeezed behing the line cables. I have asked permission to turn the board off, but this isnt really an option as the rooms all have fridges in and the students are forever studying. My question, can i obtain R1 + R2 by taking my highest Zs reading, calling the Elec board up and getting a true reading of Ze, and making a calculation. I just cant see how this would be good enough to put on a cert as the board will only give me a Ze from the intake room for starters. Plus the fact Zs will have parallel paths. Before i get abused, yes i have my 2395, although my experience in testing is limited. ( Thrown in at the deepend )
Thanks guys.
Tom
Im working in maintenance at a student accommodation. ( over 900 rooms, over 60 boards )
The buildings need their periodic inspection and testing.
Im trying to be as less disruptive as possible so am just turning the circuits off under test. However, im finding this really uncomfortable, what with the arching and cpcs squeezed behing the line cables. I have asked permission to turn the board off, but this isnt really an option as the rooms all have fridges in and the students are forever studying. My question, can i obtain R1 + R2 by taking my highest Zs reading, calling the Elec board up and getting a true reading of Ze, and making a calculation. I just cant see how this would be good enough to put on a cert as the board will only give me a Ze from the intake room for starters. Plus the fact Zs will have parallel paths. Before i get abused, yes i have my 2395, although my experience in testing is limited. ( Thrown in at the deepend )
Thanks guys.
Tom