Hi All - Hope you all had a good Christmas!
I have just recently started my own business and struggle to price work as never had anything to do with that side of things in the past.
Job is to Rewire a 3 bed Detached house
Attic - New radial circuit with 2 sockets. 2 lighting points with 1 two way switch (to first floor landing) - (Attic fully boarded)
1st floor -
3 bedrooms each with 3 new chased twin sockets. Each with 1 lighting point and 1 switch. Main bedroom to have wardrobe lighting point with single switch (chased). 2 bedrooms to have Switched fused spur + install ring camera back entry to external wall.
Bathroom - 1 lighting point 1 switch, 1x 12v outlet (from lighting circuit) 1 extract via 3 pole isolator
Hallway - 1 new wall light with 1 way switch. Landing light with 2 way switch to ground floor. 1 twin socket (chased).
Mid staircase- New twin socket
Ground floor
Hallway - 1 twin socket chased. 4 spot lights. 2 way switching (hallway and living room).
Downstairs bathroom - 1 lighting point (1 switch). 1 extract via 3 pole isolator. 1x 12v shaver socket via lighting circuit.
Shower circuit via DP isolator.
Store room - 2 twin sockets (in stud wall). Lighting point (1 switch)
Living room - 7 twin sockets (chased). 2 lighting points (2 separate switches). Switched fused spur.
Garage - 3 sockets, 2 lights and 3 switch drops (intermediate switching) (sockets and switches in 20mm pvc conduit approx 12m to instal).
New fuse board + Test and certification. (Gas and water 10mm earth bonding already present).
No works in kitchen as is an extension and cable readings were satisfactory.
House completely empty - 1 man and 1 labourer to complete works
Any input feedback would be greatly appreciated ??
I do a drawing if that help
I have just recently started my own business and struggle to price work as never had anything to do with that side of things in the past.
Job is to Rewire a 3 bed Detached house
Attic - New radial circuit with 2 sockets. 2 lighting points with 1 two way switch (to first floor landing) - (Attic fully boarded)
1st floor -
3 bedrooms each with 3 new chased twin sockets. Each with 1 lighting point and 1 switch. Main bedroom to have wardrobe lighting point with single switch (chased). 2 bedrooms to have Switched fused spur + install ring camera back entry to external wall.
Bathroom - 1 lighting point 1 switch, 1x 12v outlet (from lighting circuit) 1 extract via 3 pole isolator
Hallway - 1 new wall light with 1 way switch. Landing light with 2 way switch to ground floor. 1 twin socket (chased).
Mid staircase- New twin socket
Ground floor
Hallway - 1 twin socket chased. 4 spot lights. 2 way switching (hallway and living room).
Downstairs bathroom - 1 lighting point (1 switch). 1 extract via 3 pole isolator. 1x 12v shaver socket via lighting circuit.
Shower circuit via DP isolator.
Store room - 2 twin sockets (in stud wall). Lighting point (1 switch)
Living room - 7 twin sockets (chased). 2 lighting points (2 separate switches). Switched fused spur.
Garage - 3 sockets, 2 lights and 3 switch drops (intermediate switching) (sockets and switches in 20mm pvc conduit approx 12m to instal).
New fuse board + Test and certification. (Gas and water 10mm earth bonding already present).
No works in kitchen as is an extension and cable readings were satisfactory.
House completely empty - 1 man and 1 labourer to complete works
Any input feedback would be greatly appreciated ??
I do a drawing if that help