Firstly hi everyone. I am an electrical engineer in the manufacturing industry. I hold the BS7671 17th edition certificate and have a HND in electrical engineering.

My confusion is as follows;
We are having an extension built which is going to be a family room added on to the existing kitchen. We have had building control involved to inspect the build etc.
I am doing the electrical work myself and I have run all the cables for the ring main and the lighting circuits to BS7671 standards. I plan on connecting the extension sockets to the the kitchen ring main (extending the ring and not spurring off) and extending the downstairs lighting circuits to complete the build. I had a registered electrician out to check my work was ok at first fix and was verified as good. I also took plenty of photos before the plaster board went on.

Can I test/sign off the minor works myself with my qualifications/certifications? Or do I need building control to sign off the work even though they haven’t inspected the first fix? I am confused with the notify part and the sign off part and now the plaster is on, I am getting worried it may have to come off again if building control get involved!

Sorry for the long thread and thanks in advance for any help.

C
 
You have to speak to building control explain where you are and ask what they will accept as it is their decision irrespective of what anyone says on here. It really depends on the BCO and the local policy. You cannot sign off/notify the work yourself unless you are a member of a Part P scheme. Inspect and test and notification to local authority is completely different. You could try and find a local electrician who will be happy to do a third party sign off/notification. Personally I would speak to the sparks who came in and inspected your first fix as this may be the path of least resistance.
 
You cannot sign off/notify the work yourself unless you are a member of a Part P scheme. Inspect and test and notification to local authority is completely different.
I'm struggling to make sense of your post, 'signing off/notification is completely different to inspecting and testing/notification'?
It appears that there will be no requirement to notify this works to BC, therefore all that will be needed is a MW cert for each altered circuit, which the OP can issue to himself without any input from a scheme
 
if the labc do require certification you will need to get your original electrician to view your second fix and then test & certify as a third party as I don't see how the qualifications you hold deem you competent to verify and certificate this work.

What qualifications would deem me competent? Inspection and testing cert? Member of a body like niceic? Thanks
 
I'm struggling to make sense of your post, 'signing off/notification is completely different to inspecting and testing/notification'?
It appears that there will be no requirement to notify this works to BC, therefore all that will be needed is a MW cert for each altered circuit, which the OP can issue to himself without any input from a scheme
Thanks, that’s what I thought but I have read so many conflicting information on forums/sites etc I am confused. Building control are asking for the “Electrical Installation to be certified by a qualified/competent electrician”
 
You have to speak to building control explain where you are and ask what they will accept as it is their decision irrespective of what anyone says on here. It really depends on the BCO and the local policy. You cannot sign off/notify the work yourself unless you are a member of a Part P scheme. Inspect and test and notification to local authority is completely different. You could try and find a local electrician who will be happy to do a third party sign off/notification. Personally I would speak to the sparks who came in and inspected your first fix as this may be the path of least resistance.
Thank you, I will speak to them, then hopefully it removes any uncertainty. Thanks again.
 
Even though it may not be a notification issue the BCO will still want to see some kind of certification.
I'm struggling to make sense of your post, 'signing off/notification is completely different to inspecting and testing/notification'?
It appears that there will be no requirement to notify this works to BC, therefore all that will be needed is a MW cert for each altered circuit, which the OP can issue to himself without any input from a scheme
As this installation is part of wider building work for which the labc are already involved it will still fall under their control. What they will and won't accept to 'sign off' the whole extension in the non electrical sense of the word will depend on local policy, even though it may not be 'notifiable work' in isolation under Part P' it will still have to subject of certification to the building control. Some labc may not accept a MWC and some may not accept a EIC from a person who is not Inspect and Test Qualified. Hence best to speak to them to check.
 
worse case scenario is you effectively have to do the building control route out of time (ie after work is done) normally this means the standard fee for the council you are using plus a fee on top in BANES this is std + 10%, (if you are near a council border you can sometimes get away with the neighbouring council who might be cheaper! i know a property developer who uses Bristol BC rather than banes due to past grievances!) They will then send out an electrician, normally a contractor the council know to be thorough who will essentially do a eicr on the works in question and check over your own results, paperwork, photos etc.. assuming no issues the council issue a letter saying all complies. It all comes down to ÂŁÂŁÂŁÂŁ more than anything as the council want your money, they charge you say ÂŁ300 and pay the electrician ÂŁ200 they have an extra ÂŁ100 in the kitty.
 
Thank you all for your replies. The letter building control have sent us states;

“ Electrical installation to be certified by a qualified/competent electrician”.

It is the competent part I would fall under I suppose?
Might be worth giving them a call and asking if they will be happy with a eicr by an electrician who is a member of a scheme... then its a case of if you are happy it complies and trust your own work, take the cheapest quote! as the eicr is purely a means to an end
 

Reply to Hi all. Help on part P required please. in the UK Electrical Forum area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
424
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
1K
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
1K

Similar threads

This situation is not uncommon and is absolutely nothing to lose sleep over. There are plenty of properties sold without the 'required' electrical...
Replies
5
Views
728
It applies to commercial if it shares the same supply as a dwelling.
Replies
4
Views
594

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top