Firstly hi everyone. I am an electrical engineer in the manufacturing industry. I hold the BS7671 17th edition certificate and have a HND in electrical engineering.
My confusion is as follows;
We are having an extension built which is going to be a family room added on to the existing kitchen. We have had building control involved to inspect the build etc.
I am doing the electrical work myself and I have run all the cables for the ring main and the lighting circuits to BS7671 standards. I plan on connecting the extension sockets to the the kitchen ring main (extending the ring and not spurring off) and extending the downstairs lighting circuits to complete the build. I had a registered electrician out to check my work was ok at first fix and was verified as good. I also took plenty of photos before the plaster board went on.
Can I test/sign off the minor works myself with my qualifications/certifications? Or do I need building control to sign off the work even though they haven’t inspected the first fix? I am confused with the notify part and the sign off part and now the plaster is on, I am getting worried it may have to come off again if building control get involved!
Sorry for the long thread and thanks in advance for any help.
C
My confusion is as follows;
We are having an extension built which is going to be a family room added on to the existing kitchen. We have had building control involved to inspect the build etc.
I am doing the electrical work myself and I have run all the cables for the ring main and the lighting circuits to BS7671 standards. I plan on connecting the extension sockets to the the kitchen ring main (extending the ring and not spurring off) and extending the downstairs lighting circuits to complete the build. I had a registered electrician out to check my work was ok at first fix and was verified as good. I also took plenty of photos before the plaster board went on.
Can I test/sign off the minor works myself with my qualifications/certifications? Or do I need building control to sign off the work even though they haven’t inspected the first fix? I am confused with the notify part and the sign off part and now the plaster is on, I am getting worried it may have to come off again if building control get involved!
Sorry for the long thread and thanks in advance for any help.