jjjinx
-
Hi guys,
I know that it may be a little hard to give correct information but I'm interested in knowing how long it takes peps to do your job:
PIR's EIC's first fix rewires (will need to state details on the extent of the rewire prob)
EIC's I give a 8hrs to but can get it done in less on occations doing full tests but only R2's to the light switches from the rose after R1+R2 at the rose.
I rarely get a PIR done inside 3hrs on a anything larger than a 3 bed house with only one DB. Usually 6-7 circuits including 2 rings.
Do you do the full figure of 8 ring tests or do you cut corners? you can PM me those if you don't want to say.
I hear that other sparks get things done in 2hrs or less but I would like to know from you guys what the real info is?
I know that it may be a little hard to give correct information but I'm interested in knowing how long it takes peps to do your job:
PIR's EIC's first fix rewires (will need to state details on the extent of the rewire prob)
EIC's I give a 8hrs to but can get it done in less on occations doing full tests but only R2's to the light switches from the rose after R1+R2 at the rose.
I rarely get a PIR done inside 3hrs on a anything larger than a 3 bed house with only one DB. Usually 6-7 circuits including 2 rings.
Do you do the full figure of 8 ring tests or do you cut corners? you can PM me those if you don't want to say.
I hear that other sparks get things done in 2hrs or less but I would like to know from you guys what the real info is?