I agree not aimed at one man band however I'm little more than that and I've gone through it.
MCS requires two systems of renewable to be installed for inspection . NICEIC have now reduced this to one. Unless you can find a very understanding customer to have it installed by a none MCS installer and so can not gain FiTs payments then it would be a case of buying a system and fitting it to your own property. Estimate ÂŁ2K for that.
Paperwork. LOTS of it! You will need EVERY document regarding PV. All the MCS, Part P, guidance on installation of PV, etc etc. ISO documents at ÂŁ130+ each.
You will then need method statements, risk assessments, sub contractor purchase orders, conditions of sale, terms of contract, quality control manual, copy of customer quotation, design plan, end user documentation, warranty info, product information, schematic drawings, supplier list and contact details. And there is more.
I have had to produce a quality control manual for if I have a holiday I can hand a stand in this folder for he or she to run my business while I’m away! RUBBISH!
But still now got it so now all I have to do is keep on top of it over the coming years. Government red tape and lots of it. It’s the same process if its Bristish Gas down to Billy one man band!
I have four larger lever arch files full of documents.
My company investment for training and MCS including two systems installed on our own properties is over ÂŁ12K and that is on the cheep side.