Im after some advice on protocol and where I stand regarding a single signature electrical installation certificate.
I wont bore you with a long winded story of events, but basically we had some renovation work on the downstairs of our house carried out by a local builder who was recommended to us. The job basically involved virtually re-wiring the majority of the downstairs to our property including a new fuse box.
The work was carried out by two guys who worked with the builder who we assumed were fully qualified.
We had numerous issues with certain lights and switches along the way, plus other plumbing issues and totally lost all confidence in them the further the job went. We had numerous issues with damage to doors and flooring etc etc. One of the problems we had was neither of the two guys who carried out the electrical work wanted to put their name to any sign off electrical certification thus basically high lighting to us that they were not fully qualified as electricians.
On the final day of the work being completed the main builder told us that he would have to send off for the certificate and that it could take up to three weeks to come through to us?
Alarm bells were ringing now, a. why wouldnt neither of the guys sign it off?
b. who has been and checked all the wiring etc as they hadnt told us of anyone else coming to do this, and I was around for a lot of the time as I work shift hours?
c. Should any type of certificate take this long to come through and what type should it be and what do they look like?
d. We emailed the builder 2 nights ago asking about the outstanding certificate which is now 8 WEEKS since he finished the rest of the job and nothing has turned up (a final payment is still outstanding but he has not even asked for this?)
e. Tonight I have an envelope discretely put through my letterbox without the courtesy to knock with 4 sheets of A4 paper in all filled in by someone we dont know has been here, an incorrect date to it when the supposed sign off was carried out, I was here then and it was not on that day!? The certificate was printed then filled in throughout looking quite legitimate and with the chaps registration number on it. But why does it all of a sudden arrive once Id contacted him about it 8 weeks after the job finished??
Could someone tell me what the protocol is and how I can check if this is legitimate because I know no one has been here to check the wiring.
I've also read online that no third partys not involved in the work from the outset can 'sign off' electrical work to this degree.
Any advice much appreciated
Thanks John
Im after some advice on protocol and where I stand regarding a single signature electrical installation certificate.
I wont bore you with a long winded story of events, but basically we had some renovation work on the downstairs of our house carried out by a local builder who was recommended to us. The job basically involved virtually re-wiring the majority of the downstairs to our property including a new fuse box.
The work was carried out by two guys who worked with the builder who we assumed were fully qualified.
We had numerous issues with certain lights and switches along the way, plus other plumbing issues and totally lost all confidence in them the further the job went. We had numerous issues with damage to doors and flooring etc etc. One of the problems we had was neither of the two guys who carried out the electrical work wanted to put their name to any sign off electrical certification thus basically high lighting to us that they were not fully qualified as electricians.
On the final day of the work being completed the main builder told us that he would have to send off for the certificate and that it could take up to three weeks to come through to us?
Alarm bells were ringing now, a. why wouldnt neither of the guys sign it off?
b. who has been and checked all the wiring etc as they hadnt told us of anyone else coming to do this, and I was around for a lot of the time as I work shift hours?
c. Should any type of certificate take this long to come through and what type should it be and what do they look like?
d. We emailed the builder 2 nights ago asking about the outstanding certificate which is now 8 WEEKS since he finished the rest of the job and nothing has turned up (a final payment is still outstanding but he has not even asked for this?)
e. Tonight I have an envelope discretely put through my letterbox without the courtesy to knock with 4 sheets of A4 paper in all filled in by someone we dont know has been here, an incorrect date to it when the supposed sign off was carried out, I was here then and it was not on that day!? The certificate was printed then filled in throughout looking quite legitimate and with the chaps registration number on it. But why does it all of a sudden arrive once Id contacted him about it 8 weeks after the job finished??
Could someone tell me what the protocol is and how I can check if this is legitimate because I know no one has been here to check the wiring.
I've also read online that no third partys not involved in the work from the outset can 'sign off' electrical work to this degree.
Any advice much appreciated
Thanks John