Hypothetical question | Page 2 | on ElectriciansForums

Discuss Hypothetical question in the UK Electrical Forum area at ElectriciansForums.net

J

jdd

If you had a steel framed building with the electrical service at one end and the gas/water service at the other end. Would it be possible to bond the steel as normal, but then just bond the gas/water service straight to the steel work, instead of taking back to the MET.
 
It's one of my favourite pinball back glasses from the golden era of 70s pinball artwork.
I'll reinstate the old mush if you really want, too wrecked at the moment.

[ElectriciansForums.net] Hypothetical question
 
Full avatar, a Schrage motor.
To this day I’m still not sure how they work. Only ever seen them on German printing presses. The speed is varied by the brushes being moved further apart. So you would have a motor controlling the speed of a motor.
Weird things! Like me before you get your oar in!



View attachment 12944
 
Last edited by a moderator:
Full avatar, a Schrage motor.
To this day I’m still not sure how they work. Only ever seen them on German printing presses. The speed is varied by the brushes being moved further apart. So you would have a motor controlling the speed of a motor.
Weird things! Like me before you get your oar in!



View attachment 12944

Interesting object!?!

You really should try 3d AutoCad, you've got the basics.
As an engineer of your years I should imagine you've got the spacial awareness to stroll this.

Just tried putting up some 3D images but failed.
 
Getting back to the original question, No idea why there are some here, that think a steel framed building that's been bonded and probably providing a pretty decent earth in it's own right, can't act as a bonding conductor. Whole factories use the steel framing of steel framed structures as it's bonding medium, for all of the factory plant and it's fixed equipment... You would need to install a huge copper conductor to match the volume and paths of conductivity that the steelwork will provide!! lol!!
 
No I wouldn't. I would price accordingly to run the bond to the gas and water.

You must be very naive if you are thinking that the mass of steel in a steel framed building isn't going to be superior, than your 10mm or whatever bonding conductor!! ...God knows what sort of money you'll be asking for all that cable, cable fixing and/or containment!! lol!!
 

Reply to Hypothetical question in the UK Electrical Forum area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
303
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
819
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
897

Similar threads

  • Solved
There is an article about that here: https://www.cement.org/learn/concrete-technology/durability/corrosion-of-embedded-materials It states...
2
Replies
27
Views
2K
  • Question
If it's buried ducting, have you thought about digging up a section of the buried cable close by, cutting it and pulling in a few extra meters...
Replies
6
Views
808

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top