Evening.
I was wondering if anyone knew or has sourced Imperial metal conduit Dies?
I have a job coming up in an old mansion house where there is existing imperial conduit drops down to a consumer unit location above a ceiling which is accessible through a large hatch right at the DB. The customer however wants to raise the ceiling and I am going to need to fit new board etc which is not a problem. However there are 5 existing imperial conduits come down through the ceiling above which I am going to need to very carefully cut them at a higher location and try to run a new thread on them further up where I can bring them into a large galv joint box and get appropriate lockrings etc etc for them to remain a good earthing system with the single core pvc cables within them.
Unfortunately I would have liked to lift the floor above and take the pipes back to the next box and re jig and rewire it all from there but this is not possible due to massive newly tiled floor bathroom above.
I am aware of the imperial to metric adaptors however I need to cut the pipes further up and then re thread. Anyone any other ideas? I could obviously put earth clamps round each of the 5 pipes at a nice clean location but this would look a bit scabby I think
Cheers in advance for any thoughts
I was wondering if anyone knew or has sourced Imperial metal conduit Dies?
I have a job coming up in an old mansion house where there is existing imperial conduit drops down to a consumer unit location above a ceiling which is accessible through a large hatch right at the DB. The customer however wants to raise the ceiling and I am going to need to fit new board etc which is not a problem. However there are 5 existing imperial conduits come down through the ceiling above which I am going to need to very carefully cut them at a higher location and try to run a new thread on them further up where I can bring them into a large galv joint box and get appropriate lockrings etc etc for them to remain a good earthing system with the single core pvc cables within them.
Unfortunately I would have liked to lift the floor above and take the pipes back to the next box and re jig and rewire it all from there but this is not possible due to massive newly tiled floor bathroom above.
I am aware of the imperial to metric adaptors however I need to cut the pipes further up and then re thread. Anyone any other ideas? I could obviously put earth clamps round each of the 5 pipes at a nice clean location but this would look a bit scabby I think
Cheers in advance for any thoughts