Ive got the task of sorting out the electrical supply to all the equipment and lighting in our bodyshop as we've just moved to a larger workshop
we have a new board installed with a 125A 3 phase supply installed, the first problem is that the board only has space for 4 circuits
we have the following to supply
electric shutter (10A fuse) 3ph
Spray booth with 2x 4kw fans 9A each 3ph
Compressor (info as on plate on electric motor) 3ph
5.6kW
18.2A/10.6A (might be wrong but im guessing the starting power required is the 18.2A and the continuous draw when running 10.6A??)
Welder 3ph (20A fuse fitted)
what was suggested to me was we should install a single phase board along side the existing one to then run all the single phase items, power points, lighting circuits
first question, the trunking carrying the cables around the shop, its positioned at 2000mm from the floor 50x50 does this have to be metal trunking, or is plastic suitable
who should be contacted to certify the system as safe when the installation is complete
also where will I find the regulations to follow for a commercial property such as ours?
I have done a number of CMS designs for LUL underground stations, but we were talking about huge cable trays with high voltage armoured cables so not really the same thing
finally, best place for me to order the cable, trunking, clips etc..
thanks
we have a new board installed with a 125A 3 phase supply installed, the first problem is that the board only has space for 4 circuits
we have the following to supply
electric shutter (10A fuse) 3ph
Spray booth with 2x 4kw fans 9A each 3ph
Compressor (info as on plate on electric motor) 3ph
5.6kW
18.2A/10.6A (might be wrong but im guessing the starting power required is the 18.2A and the continuous draw when running 10.6A??)
Welder 3ph (20A fuse fitted)
what was suggested to me was we should install a single phase board along side the existing one to then run all the single phase items, power points, lighting circuits
first question, the trunking carrying the cables around the shop, its positioned at 2000mm from the floor 50x50 does this have to be metal trunking, or is plastic suitable
who should be contacted to certify the system as safe when the installation is complete
also where will I find the regulations to follow for a commercial property such as ours?
I have done a number of CMS designs for LUL underground stations, but we were talking about huge cable trays with high voltage armoured cables so not really the same thing
finally, best place for me to order the cable, trunking, clips etc..
thanks