On an eicr we can write LIM for L-N testing and do a test with L-N connected to earth if there's too many electronics to unplug.
What about on an EIC when only doing something like a CU upgrade? Can't do the IR test between L-N with too many things to unplug and we can't write LIM on EIC in the live-live column?
So what to write in the L-L test columns on an EIC?
I know its always good to do the EICR before upgrade, but still got to do the EIC afterwards.
Thanks in advance.