Hey guys
On the summary test data, the "Minimum IR" Is that a global reading they're looking for ie ; just the entire installation tested
Or is every final circuit tested during the PIR to find the lowest reading
Also for a 4(doesn't comply with current rules), how do you determine if anything needs to be done.
Do you need to know the age of the installation work ?
Same there for location of switches , are they looking for correct height from et101 on ?
Old work only needs to comply with old regs doesn't it ?
New to them cheers
On the summary test data, the "Minimum IR" Is that a global reading they're looking for ie ; just the entire installation tested
Or is every final circuit tested during the PIR to find the lowest reading
Also for a 4(doesn't comply with current rules), how do you determine if anything needs to be done.
Do you need to know the age of the installation work ?
Same there for location of switches , are they looking for correct height from et101 on ?
Old work only needs to comply with old regs doesn't it ?
New to them cheers