Yep thanks, I think that is the most suitable solution and note on the EIC. The client is a mate of mine, so I suspect in the course of time we can remove the radiator, crimp the old sso connections and blank off the socket. Then provide a new suitable supply cable from the new CU. But for the assessment, I think Engineer54 solution is the answer to my predicament.