Afternoon all.
Been approached by a Marquee to carry out temporary supply's to Marquees. The owner was unhelpful about that the previous electrician use to do for a " Mains Tap " as he calls its.
They have a load of 16a sockets units made up with 30mA protection on each sockets.
My thoughts are as followed.
At the mains I would supply and 100A 100mA time delayed RCD with a 63a MCB feeding a 63a isolator. New tails into an iso block. The marquee company will get the cable into and through the has and plug in when required .
At the marquee side, I will connect into there consumer unit, I guessing I would not connect the earth and supply and Steak or TT earth to the consumer unit.
Thoughts all?
Been approached by a Marquee to carry out temporary supply's to Marquees. The owner was unhelpful about that the previous electrician use to do for a " Mains Tap " as he calls its.
They have a load of 16a sockets units made up with 30mA protection on each sockets.
My thoughts are as followed.
At the mains I would supply and 100A 100mA time delayed RCD with a 63a MCB feeding a 63a isolator. New tails into an iso block. The marquee company will get the cable into and through the has and plug in when required .
At the marquee side, I will connect into there consumer unit, I guessing I would not connect the earth and supply and Steak or TT earth to the consumer unit.
Thoughts all?