Looked at a job the other day where client has installed himself a solar pv system with batteries.
The pv system is less than the magic figure of 3.6Kw.
He has asked us to connect to the electrical installation using an EPS output in event of power failure, and advice as he wants to export but as it is basically a DIY system how can he get MCS 3rd party approval? (We are electricians, not MCS so unaware of the implications)??
The pv system is less than the magic figure of 3.6Kw.
He has asked us to connect to the electrical installation using an EPS output in event of power failure, and advice as he wants to export but as it is basically a DIY system how can he get MCS 3rd party approval? (We are electricians, not MCS so unaware of the implications)??