S skiandy May 20, 2010 #1 Is it still acceptable to run in new circuits by using meter block and installing a fused isolator? Its a small commercial job, 3 Phase.
Is it still acceptable to run in new circuits by using meter block and installing a fused isolator? Its a small commercial job, 3 Phase.
Griffin - May 21, 2010 #2 Why not just install a small board, Main switch, MCB's, RCBO's etc if required? G