P
petegibbons
I have been asked for a method statement for how I would go about installing an electrical installation.
They want me to write down stage by stage the whole procedure an engineer would go through when installing, stage by stage and what precautions, safety measures are in place, ie, ppe, specialist equipment, areas cordoned off or notices up etc.
I was hoping someone on here may have an example of this, or point me in the correct direction as to where I could get one form. It would save me a lot of time and they'll probably find something wrong with whatever I do at the moment anyway.
Any help would be appreciated!!
They want me to write down stage by stage the whole procedure an engineer would go through when installing, stage by stage and what precautions, safety measures are in place, ie, ppe, specialist equipment, areas cordoned off or notices up etc.
I was hoping someone on here may have an example of this, or point me in the correct direction as to where I could get one form. It would save me a lot of time and they'll probably find something wrong with whatever I do at the moment anyway.
Any help would be appreciated!!