Hi Guy,

I’ve contacted my DNO Scottish power and they’ve quoted me a price of £760 to move my connection point and meter. I seem to be doing most of the work with them pretty much terminating it.
I’ve been looking for someone else to do the work as I’ve believe it’s ‘contestable’ but I’m having no luck.
Does anyone have an advice. Cheers
 
U.K. Power Networks my local DNO are extremely frustrating to deal with and make hard work of the simplest of jobs. I suspect most of them are the same. I’ve not heard of a realistic alternative in this area at least though.

Either pay up or forget about moving it is the bottom line really.
 
Wanted my own meter point moved about 11 years ago. Long story short, price from SWEB was initially £0, then £3000, and eventually back to £0, which was the price I paid.
7 years ago, I wanted two extra meter points on my property, each requiring a buried cable run of about 100m, and for that I was quoted £800. Payment was made by return.
Conclusion: There is absolutely no logic whatsoever in their quotes.
 
Hi Guy,

I’ve contacted my DNO Scottish power and they’ve quoted me a price of £760 to move my connection point and meter. I seem to be doing most of the work with them pretty much terminating it.
I’ve been looking for someone else to do the work as I’ve believe it’s ‘contestable’ but I’m having no luck.
Does anyone have an advice. Cheers
How much are you are you expecting to save on a quote of £760 you will probably waste more time, effort and money trying to get a cheaper quote and not see any saving on the quote you already have
 
In my £800 example above, SWEB found someone to "do it on the side". We had fitted all the ducting and backfilled the trenches, then a couple of dubious looking kids turned up at 7pm, towing a cable reel behind an ordinary car. They proceeded to draw in the two lengths of split concentric, and to fit the meter boards and service heads.
One meter board was only fixed at its very bottom edge, so flapped about, and the other, although securely fixed, was over 10mm out of square along its top edge.
 
Well I was hoping to find someone to do it on the side
No one in their right mind would move a Meter 'on the side'. Pay up, dont be cheap. You and/or your family's life is worth a lot more than 760 quid. Never mind the court case that would follow altering it without permission.
 
Thats not bad - UKPN here, typically they'll want several grand, all the work done for them ie duct form service head to street, and in addition to the prep I'll have to include a days babysitting time as every operative they employ will turn up and try to cancel the job for some menial reason (£500 plus building left without power)

Highlights include:

*no 6mm poly rope in duct as spec (duct had 4mm single in it)
*cross bond undersized (one of them found a regs book and noted that on PME the DNO can request a larger size!)
*installation not ready (meter fixer turned up for "PM" appointment at 11:15am, and despite 2 of 4 being ready with the other two only a few minutes work he turned on the bolsch and tried to say we were not ready so cancelled job meaning 3 angry flat owners with no power! (this was my favourite as I told him he'd have to speak to the client/leaseholder, gave him my phone, and the woman systematically destroyed him over the course of the next half-hour while all he could do was splutter, I completed my end of the work, he returned a broken man and quietly went about his job)
 
I take it that cut out will be moved as well, if it was just meter most energy suppliers will do that for free, any where on the back board. To move cutout and meter to any distance that is not a bad price.
 
No one in their right mind would move a Meter 'on the side'. Pay up, dont be cheap. You and/or your family's life is worth a lot more than 760 quid. Never mind the court case that would follow altering it without permission.
You'd be amazed then, probably due to local DNO being.... "complicated" to deal with, there's a thriving market in dodgy blokes who've done a bit of work for the leccy board/ or side jobs, who'll do anything you require. (Don't get involved myself for obvious reasons, but I cant criticise people using this route.)
 

Reply to Moving Connection point and meter in the UK Electrical Forum area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
380
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
956
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
1K

Similar threads

  • Question
The last couple of de-loops that I have been involved with had the single phase supply replaced with a three phase cutout (as I believe the DNOs...
Replies
5
Views
997
  • Question
Sorry for the late reply I found it very difficult to find work but I’m not sure if this was down to Covid and all the lock downs happening just...
Replies
2
Views
623

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top