3 weeks ago I did the first fix on a refurbishment of kitchen. I have only just had a phone call to come and do the second fix.

The customer is unhappy as the builder has said he cannot use the cable I had in position for the downlights? He has gone ahead and put the ceiling up and just left all the cable that I had neatly dangling up in the void which is now not reachable without lifting floorboards.

He had said that he would position all the downlight holes and just pull the cable through, but the customer has said that he said the cable was not in the right position and would leave a big gap in the middle of the kitchen.

I specifically left plenty of cable (about 1.5m) dangling from the ceiling at each point so he could choose where he positioned the downlights and I spaced them out fairly evenly (as much as you can when just hanging from joists waiting for the ceiling to go up). So apart from the fact that it doesn't make sense, it would have been a good idea to call me before putting the ceiling up and hiding all my cable?

I cant get hold of the builder!

I know I'm pretty new to this game but I cant see I've done anything wrong and I have not had an unsatisfied customer before.. Have I done anything wrong here?
 
Hum... never let a builder take responsibility for drilling the holes!

Why does the builder not think the cable was suitable - what was the cable and what type of lights were you fitting?
 
In a situation like this I always mark the walls with the position of the joists, That way you know where they are and roughly where your cables will be.
That said, the builder has no knowledge of how you selected your cables so it is easy to baffle him with calcs. Most of them are clueless when it comes to electricity mate
 
Did you, liase with the customer or builder into regards of the positioning of the down lights or ask to be told when the ceiling would be boarded?

Positioning of downlights was just a straight forward 2 rows of 4, so yes to first part of your question. As for asking when the ceiling would be boarded, 'No'.. The builder has 20 years experience, I think he could have used a bit of initiative and called me before boarding up the cable, that doesn't seem very sensible. What do you think Dillb?

Hum... never let a builder take responsibility for drilling the holes!

Why does the builder not think the cable was suitable - what was the cable and what type of lights were you fitting?

Sorry Murdoch, I should have been more clear. The builder is not happy with the positioning of the cable. The client specifically wanted the builder doing as much as possible as he was a neighbour giving them a good rate so he was to position and drill holes. But it makes no sense as there was a huge amount of dangling cable to play with, with regards positioning?


The cable was (x2) T&E at each hole which would have been put into a wago and then Heat resis flex to light.
 
I think he could have used a bit of initiative and called me before boarding up the cable, that doesn't seem very sensible. What do you think Dillb?

2 things, firstly don't expect a builder to have any initiative.

Secondly if you haven't asked to be there how would he know you want to be there?
 
In a situation like this I always mark the walls with the position of the joists, That way you know where they are and roughly where your cables will be.
That said, the builder has no knowledge of how you selected your cables so it is easy to baffle him with calcs. Most of them are clueless when it comes to electricity mate

Allways do a plan to show you joist positions and cable positions.

Sounds like your gonna learn the hard way that most builders are tools.

I definitely would have done, but the builder and client made it very clear that the builder was going to drill holes and pull cable through, thats what they wanted. They also wanted him to do the second fix, but i said I wont sign it off unless I do the second fix!

I'm not enjoying this particular job! :-(
 
As most of the comments above, you can never trust a builder to do anything, even if you explain it 10 times they will c*** it up!!

Learn the hard way on this one, but make a plan of joists and positions of cables in future. If possible cut holes before skim coat and its happy days! Plasterers hate it mind!!

Ive learnt the hard way recently when i lost my plan for a kitchen with about 15 downlights!!
 
2 things, firstly don't expect a builder to have any initiative.

Thats a fair point Dillb.

Secondly if you haven't asked to be there how would he know you want to be there?

He's changed the rules, he's made the decision NOT to pull the cable through which was agreed so I need to be informed of that at that time as it impacts on the remainder of my job. I cant tell that he's going to change the rules.
 
So if it's down to the clown and there's lots of length on the cables what the hell is his problem?
1.5 metres is plenty of slack

Thats what I just cant get my head around (smiley things arn't working ... damn!)

As most of the comments above, you can never trust a builder to do anything, even if you explain it 10 times they will c*** it up!!

Learn the hard way on this one, but make a plan of joists and positions of cables in future. If possible cut holes before skim coat and its happy days! Plasterers hate it mind!!

Ive learnt the hard way recently when i lost my plan for a kitchen with about 15 downlights!!

Yep.. Like Dillb said... I should not have expected initiative. I've only worked with 2 other builders and they were both great! Kind of thought thats the norm!!
 
As most of the comments above, you can never trust a builder to do anything, even if you explain it 10 times they will c*** it up!!

Learn the hard way on this one, but make a plan of joists and positions of cables in future. If possible cut holes before skim coat and its happy days! Plasterers hate it mind!!

Ive learnt the hard way recently when i lost my plan for a kitchen with about 15 downlights!!

depends on the builder, ive worked with one before where he is better than a lot of house bashers I have met, doesnt have a clue about regs but will call you to get you down before boarding etc if needs must.

nothing wrong with one lending a hand if it is something foolproof like stripping cables ready for connecting etc
 

Reply to My first difficult client! in the Talk Electrician area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
307
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
830
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
929

Similar threads

Problems can arise when you get on too well then they think he won’t mind me doing a bit.
    • Friendly
    • Like
Replies
8
Views
442
The challenge that you have with this is that you've no confirmed start point. Because you have a lack of an EICR you don't actually know what...
Replies
7
Views
589

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top