Hi. I'm new on here. I'm not an electrician. I'm just seeking some advice. I hope this is the correct section. My parents have just had a new consumer unit fitted. The electrician is NAPIT registered. He didn't leave an installation certificate. When I phoned him and asked about this he explained that it's all submitted online these days, just like gas safe certification. Is this correct? Or should I demand an actual physical copy? Many thanks.
 
only notification under part p is submitted on line. as for the cert. he should have given you one. it's about 6 pages and should have a schedule of test results attached.
[ElectriciansForums.net] New Consumer Unit
 
Sorry to go off-topic, but I have noticed that when people reference that registration body there is a mouseover which claims that the body are operated by Certsure, which clearly isn't correct.
 
Thanks for all the advice. He's assured me they'll receive a hard copy in the next few weeks and that I can check building control applications for a NAPIT replacement consumer unit. Just seemed a bit dubious to me but he has loads of feedback on various sites and is registered with NAPIT like I say. Said it might be a few weeks because of delays with Covid.
 
We get 20-odd days (25?) to submit the notification to Building Control after the work is completed, but I find it better to do the certificate and paperwork asap, while I can recall all the details, rather than drag it out till the last moment.
 
Thanks for all the advice. He's assured me they'll receive a hard copy in the next few weeks and that I can check building control applications for a NAPIT replacement consumer unit. Just seemed a bit dubious to me but he has loads of feedback on various sites and is registered with NAPIT like I say. Said it might be a few weeks because of delays with Covid.
It is dubious Alscho, he should issue a completion certificate when the work was completed, there's no time scale for this.
The 25 days or 4 weeks, whatever, is for notification to BC for compliance of part P.
 

Reply to New Consumer Unit in the Electrical Wiring, Theories and Regulations area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
602
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
1K
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
2K

Similar threads

I opened up the CU again and the round junction box above and what I found was the blue and brown wires coming in from the wall just above the 15a...
2 3
Replies
33
Views
2K
  • Question
thank you it really made me feel small, maybe i played it a bit thick, but as the one needing the work done i was cap in hand, will try another...
Replies
6
Views
627

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top