I've been looking in to upgrading the mains supply to a large house that has since been split into 4 flats and add a new ryefield board etc.
UK Power have confirmed we have a cable right outside in the footpath that can be used no problem. UK Power have also confirmed that we will have to dig our own trench and lay 7m of duct on our side in a straight line to the meter cabinet (aka the majority of the heavy work). It's a very straightforward job for them. Make the new connection, pull cable through a straight line duct, connect to new head on wall. I was expecting something in the range of ÂŁ5k for the entire job. Nope. ÂŁ12,354.
Here are the options they've given me:
For ÂŁ2312 UKPN will:
1 x Pot–end
A & D Charges
For ÂŁ3576 UKPN will:
1 x LV branch Joint
1 x Pot–end
A & D Charges
For ÂŁ12,354 UKPN will:
So if you take the second and third option the difference is:
Install head, disconnect existing service, dig hole in footpath and fill, pull the cable, supply duct, cable and tape, design (what is there to design)? = ÂŁ8778
How can UK Power justify such a huge cost?! I know I have a 'right to choose' but I've emailed every company on their approved list and nobody wants to know as it's just one very simple connection. Most have said they only work on residential if its more than 10 connections. As a result I don't really have a 'right to choose'.
Any suggestions? I'm on the verge of just leaving the existing supply and hoping nothing goes bang anytime soon.
UK Power have confirmed we have a cable right outside in the footpath that can be used no problem. UK Power have also confirmed that we will have to dig our own trench and lay 7m of duct on our side in a straight line to the meter cabinet (aka the majority of the heavy work). It's a very straightforward job for them. Make the new connection, pull cable through a straight line duct, connect to new head on wall. I was expecting something in the range of ÂŁ5k for the entire job. Nope. ÂŁ12,354.
Here are the options they've given me:
For ÂŁ2312 UKPN will:
1 x Pot–end
A & D Charges
For ÂŁ3576 UKPN will:
1 x LV branch Joint
1 x Pot–end
A & D Charges
For ÂŁ12,354 UKPN will:
- Install 1 x 200amp BNO service into a common position with access to all tenants 24/7
- Disconnect the existing service
- 2 x LV joint holes in the footpath
- Excavate, Lay & Reinstatement 1m of single way duct from the Point of Connection to the customer’s boundary to meet customer duct.
- 1 x LV branch Joint
- 1 x Pot–end
- Cable Pull
- Supply Cable, Duct & tile Tape
- Reinstatement of LA land
- A & D Charges
So if you take the second and third option the difference is:
Install head, disconnect existing service, dig hole in footpath and fill, pull the cable, supply duct, cable and tape, design (what is there to design)? = ÂŁ8778
How can UK Power justify such a huge cost?! I know I have a 'right to choose' but I've emailed every company on their approved list and nobody wants to know as it's just one very simple connection. Most have said they only work on residential if its more than 10 connections. As a result I don't really have a 'right to choose'.