hi all, thanks for all your responces over the past couple of days.
assesment is this friday.
major job: consumer unit change done to the 17th, completed on 07/07/08. just got 2 rcbos to fit in the board tonight then this job is hopefully ok. except for, completed the certs on 16th forms, and one bathroom lightfitting is out of zone by 30mm. gonna redo the forms on 17th's (unless anyone says ill be ok), garage is fed from 16a mcb on RCD into a 20a DP metal clad isolator via 2.5 T&e (next to fuse board), from isolator to 2.5 2 core SWA to 2 Way consumer in garage feeding a 5amp llighting and 15a socket circuit. put this board on a seperate schedule of test results and took this board PSCC and inserted info on this sheet.
minor job: done to the 16th, Existing double socket protected by BS 3036 30a and is a spur off the ring, changed this to a RCD FCU and installed one double scoket next to this FCU and from this to anothet dbl. (Ring main to RCD Fcu to one double to one double) , main equipotential bonding ok. supp bonding not ok but doesnt matter.
Need to buy a pair of insulated croc clips and fly leads for Ring tests, a pair of Approved stepladders and thats it i think.
picking up multifunction tester "test box" 2moro aswell, to go with the company record of meters accuracy thing
other than going through previous jobs and making sure all paperwork is there incase they wanna have a look, i think im about there, bit of swatting up on testing (is a bit of a slow area for me, and proper procedures on test sheets!)
any comments/thoughts gratefully received
rich
assesment is this friday.
major job: consumer unit change done to the 17th, completed on 07/07/08. just got 2 rcbos to fit in the board tonight then this job is hopefully ok. except for, completed the certs on 16th forms, and one bathroom lightfitting is out of zone by 30mm. gonna redo the forms on 17th's (unless anyone says ill be ok), garage is fed from 16a mcb on RCD into a 20a DP metal clad isolator via 2.5 T&e (next to fuse board), from isolator to 2.5 2 core SWA to 2 Way consumer in garage feeding a 5amp llighting and 15a socket circuit. put this board on a seperate schedule of test results and took this board PSCC and inserted info on this sheet.
minor job: done to the 16th, Existing double socket protected by BS 3036 30a and is a spur off the ring, changed this to a RCD FCU and installed one double scoket next to this FCU and from this to anothet dbl. (Ring main to RCD Fcu to one double to one double) , main equipotential bonding ok. supp bonding not ok but doesnt matter.
Need to buy a pair of insulated croc clips and fly leads for Ring tests, a pair of Approved stepladders and thats it i think.
picking up multifunction tester "test box" 2moro aswell, to go with the company record of meters accuracy thing
other than going through previous jobs and making sure all paperwork is there incase they wanna have a look, i think im about there, bit of swatting up on testing (is a bit of a slow area for me, and proper procedures on test sheets!)
any comments/thoughts gratefully received
rich