NIC domestic installer assessment? | on ElectriciansForums

Discuss NIC domestic installer assessment? in the Domestic Electrician Forum area at ElectriciansForums.net

S

Stever_777

Hi Guys,

I want to fit a new shower circuit to a family members house so I can be assesed on it. It is a counsel house. My question is as well as me notifying local building control for them to come out and inspect and test my work, would my family member also have to get permission from the counsel to have to shower installed, and if she didnt get permission would that be an issue with building control coming out to test my work?

By the way I spoke to my LBC and they want ÂŁ274 to come and inspect and test for each job I`m to be assesed on.

Steve
 
you should be able to just do the work and notify BC after assessment ( always assuming you pass ) nic will tell you to notify 1st. ÂŁ274. that's a joke. as long as you 've got tea and biccies ready for the assessor and don't cock it up.........
 
Yeah NIC have told me to notify and have it all tested first, before assessment. Has anyone got first hand experience in not notifying first and is the counsel house thing an issue when I do notify. Is it true that in a counsel house you have to get permission to do any work?

Steve
 
as telectrix said do the job then notify after your assessment end the job on your assesment day. that is how i did it with elesca.
No idea if you need permission from the council to do the work in the house.
 
Not sure how quickly you become NIC registered after passing the assessment......so are you guys saying that I would be able to sign it off myself because I`ve just passed the assessment or would I still have to pay the criminal rate of ÂŁ274 to the BC. If this is the case then why not just notify when I do the job, before the assessment.......Bit confused, am I missing something here?
 
I am not with that lot
icon13.png
,but would expect the assessor to have no interest whatsoever whether the job was pre notified,they are after all just a sub contractor to the scheme
He is there to assess your competence,not to supervise building control nonesence

ÂŁ 274 pounds,I think I would chance my arm with that
icon12.png


Good luck with your assessment by the way


Oh and you have "about" 30 days to get the notification done,so there should be no problem
 
Last edited:
First hand experience from me....I didnt notify and was not an issue with NICEIC, in fact did not even come up. I notified it myself after inspection. It takes about 10 working days to be up and running after you pass. Good luck just take your time with everything and if you dont know something look in the book, which is what they will expect you to do so dont be afraid to do it!
 
Thanks for all your advice so far guys but I got a couple more questions.

Q1. One of my assessments is going to add a new circuit for a security light. Now if there are no spare ways in the CU can I use an existing lighting ciruit breaker for the new circuit...will this be acceptable?

Q2. My other assessment is going to be a CU change and the DNO fuse is sealed. If I cut the seal to pull the fuse...is that deemed unacceptable by the NIC assessor. Bearing in mind he wont see the DNO`s fuse or meter cause its outside back to back with the CU?

Steve
 
ok steve. Q1. i would come off the rfc with an d/p fcu at 5A for the secirity light. main reason being that you have isolation in case of a fault without disrupting the lighting.

Q2. pull the fuse, the seals missing anyway isn't it?
 
Steve did you explian to the building control what the shower circuit was for as the few times I dealt with my local one concerning my original aessements and helping friends do thiers, the BC normally waive the fee, or at the worst ask for a nominal one.

No I did`nt mate. I`m not doing that one now anyway and from all the info I`ve been given by the members on this site I`m not gonna bother notifying both jobs until after my assessment mate

Steve
 

Reply to NIC domestic installer assessment? in the Domestic Electrician Forum area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
228
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
687
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
644

Similar threads

  • Question
That's really helpful. Thank you so much, I will take a look.
Replies
2
Views
879
Concerning isn't it. I fear it's just going to lead to reduction in standards and entry requirements and flood the industry with even more poor...
Replies
11
Views
1K

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top