A new extension requires a new TPN mcb dis board and I was looking at serving it from the existing MCCB panel board but breakers for it are obsolete and there aren't any breakers that can be retrofitted into the board.
Who would:
1) suggest the whole MCCB panel board is upgraded and serve the extension DB from the new panel board
Or
2) split the tails after the meter and fit some Lucy blocks; serve a new switch fuse unit and serve the extension DB from the switch fuse. And keep the existing MCCB panel board well alone.
Your thoughts would be much appreciated?
Who would:
1) suggest the whole MCCB panel board is upgraded and serve the extension DB from the new panel board
Or
2) split the tails after the meter and fit some Lucy blocks; serve a new switch fuse unit and serve the extension DB from the switch fuse. And keep the existing MCCB panel board well alone.
Your thoughts would be much appreciated?