Hi Guys, looking for some clarification regarding ccu changes.
Until recently I had been working as a self employed sparkes for 40 years,
I recently got a 'proper' job so have given up my part 'p' status.
I have kept my P-liability etc so that I can do those little jobs. Recently I have looked at a small 2-way board, supplying electric gates & 1 light, ( fed from DNO meter ), the rcd is seized & i suspect the mcb wouldn't work either if required.
Am I correct to say that I can replace the faulty rcd & breaker under a minor works but am not allowed to change the actual enclosure as this would be seen as a ccu change ?.
Your thoughts would be much appreciated
Until recently I had been working as a self employed sparkes for 40 years,
I recently got a 'proper' job so have given up my part 'p' status.
I have kept my P-liability etc so that I can do those little jobs. Recently I have looked at a small 2-way board, supplying electric gates & 1 light, ( fed from DNO meter ), the rcd is seized & i suspect the mcb wouldn't work either if required.
Am I correct to say that I can replace the faulty rcd & breaker under a minor works but am not allowed to change the actual enclosure as this would be seen as a ccu change ?.
Your thoughts would be much appreciated