OLEV audit what a joke
Our audit was fine however the Niceic accredited auditor gave us a code 2 for putting the cat 5 cable through the same gland as the twin and earth supplying the charge point.
The manufacturers data states the data and power can go through the same gland in a photo as well (zappi)
Further more the data cable is monitoring band 2 voltages through a CT how am I supposed to keep 50mm away
Complained to the NICEIC and they will be contacting the auditor as it’s not correct code 2 for that.
I could go back and change it but out of principle I’m very cross and the NICEIC are puzzled as to why this has been flagged
Our audit was fine however the Niceic accredited auditor gave us a code 2 for putting the cat 5 cable through the same gland as the twin and earth supplying the charge point.
The manufacturers data states the data and power can go through the same gland in a photo as well (zappi)
Further more the data cable is monitoring band 2 voltages through a CT how am I supposed to keep 50mm away
Complained to the NICEIC and they will be contacting the auditor as it’s not correct code 2 for that.
I could go back and change it but out of principle I’m very cross and the NICEIC are puzzled as to why this has been flagged
Last edited by a moderator: