T
tomchester999
Hello
I have an outbuilding which has its own earth rod, but I am getting a 280ohm ze.
I have checked the ze in the main building and it is 150.
The earth in the 3 core SWA supplying the outbuilding is not being used, is there any reason or part of the regs that says I can't use the main building earth (rod)
I want to avoid banging in another parrallel rod at all costs as there is a lot of cotswold stone its impossible to get anything in.
thanks
Tom
I have an outbuilding which has its own earth rod, but I am getting a 280ohm ze.
I have checked the ze in the main building and it is 150.
The earth in the 3 core SWA supplying the outbuilding is not being used, is there any reason or part of the regs that says I can't use the main building earth (rod)
I want to avoid banging in another parrallel rod at all costs as there is a lot of cotswold stone its impossible to get anything in.
thanks
Tom