I currently have a shop which has 3 phase 6mm cable running to it but the shop is only allowed single phase, currently renovating and they need more than a 32a supply. Can I parallel 2 of the 6mm and upgrade the quicklag breaker to a 50a at the MSB and make it a 50a main switch at the shops sub board. Both are same length and ran in one orange circular. In AS3000 I cant fjnd anythjng other than me being able to ruth them in parallel as they are 4mm or above.
Running new sub mains is what I'm trying to avoid for the client